Abstract
The National Laboratory of the Rockies (NLR) partnered with the Tennessee Valley Authority (TVA) and the Electric Power Board of Chattanooga (EPB), a local power company in Chattanooga, Tennessee to develop distribution cost curves for a single feeder in the EPB service territory to demonstrate the relative generation, transmission, and distribution cost savings of distributed energy resources (DER) for EPB and TVA. The analysis compares the cost effectiveness of DER and traditional grid upgrades (e.g., transformer upgrades, reconductoring) when considering DER investment costs, distribution upgrade costs, and bulk grid costs. Results consider two types of DERs, front-of-the meter batteries and distributed natural gas peaker generators, and are presented for a three-phase balanced representation of the feeder. Planning decisions are modeled across a time horizon from 2025 - 2040 in 5-year increments (i.e., 2025, 2030, 2035, 2040) with a post-planning horizon year of 2050. The DER performance is modeled using representative days, with each technology following a simplified dispatch profile consistent with its typical operational role.
| Original language | American English |
|---|---|
| Number of pages | 66 |
| DOIs | |
| State | Published - 2026 |
NLR Publication Number
- NLR/PR-6A40-101675
Keywords
- capacity expansion planning
- distributed energy resources
- integrated grid planning
- non-wires alternatives
Fingerprint
Dive into the research topics of 'Using Distribution Cost Curves to Analyze Distributed Energy Resource Opportunities for Integrated Grid Planning'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver