Abstract
This report provides an independent review including an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands
| Original language | American English |
|---|---|
| Publisher | National Laboratory of the Rockies (NLR) |
| Number of pages | 44 |
| State | Published - 2011 |
Bibliographical note
Work performed by Electranix Corporation, Winnipeg, Manitoba CanadaNLR Publication Number
- NREL/SR-5500-50414
Keywords
- Electranix
- grid integration
- Hawaii Clean Energy Agreement
- Lanai
- Maui
- Molokai
- operational impacts
- transmission planning
- undersea cable
- voltage sourced converters
- XLPE cable