Abstract
A test procedure to evaluate the performance and health of field installations of grid-connected battery energy storage systems (BESS) is described. Performance and health metrics captured in the procedures are: round-trip efficiency, standby losses, response time/accuracy, and useable energy/state of charge at different discharge/charge rates over the system's lifetime. The procedures are divided into reference performance tests, which require the system to be put in a test mode and are to be conducted in intervals, and real-time monitoring tests, which collect data during normal operation without interruption. The procedures can be applied on a wide array of BESS with little modification and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditure. Simulated results based on a detailed system simulation of a prototype system are provided as guideline.
| Original language | American English |
|---|---|
| Pages | 1-5 |
| Number of pages | 5 |
| DOIs | |
| State | Published - 29 Jan 2018 |
| Event | 2017 IEEE Power and Energy Society General Meeting, PESGM 2017 - Chicago, United States Duration: 16 Jul 2017 → 20 Jul 2017 |
Conference
| Conference | 2017 IEEE Power and Energy Society General Meeting, PESGM 2017 |
|---|---|
| Country/Territory | United States |
| City | Chicago |
| Period | 16/07/17 → 20/07/17 |
Bibliographical note
See NREL/CP-5D00-67419 for preprintNLR Publication Number
- NREL/CP-5D00-71651
Keywords
- Batteries
- Condition monitoring
- Energy efficiency
- Energy storage
- System testing
Fingerprint
Dive into the research topics of 'Performance and Health Test Procedure for Grid Energy Storage Systems'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver