Skip to main navigation Skip to search Skip to main content

Motor Assembly Plant Saves $85,000 with Compressed Air System Improvements (Bodine Electric's Chicago Facility): Office of Industrial Technologies (OIT) BestPractices Technical Case Study

    Research output: NLRBrochure

    Abstract

    This case study is one in a series on industrial firms who are implementing energy efficient technologies and system improvements into their manufacturing processes. This case study documents the activities, savings, and lessons learned on the Bodine Electric motor assembly plant project.
    Original languageAmerican English
    PublisherNational Laboratory of the Rockies (NLR)
    Number of pages4
    StatePublished - 2001

    NLR Publication Number

    • NREL/BR-810-30207

    Other Report Number

    • DOE/GO-102001-1324

    Fingerprint

    Dive into the research topics of 'Motor Assembly Plant Saves $85,000 with Compressed Air System Improvements (Bodine Electric's Chicago Facility): Office of Industrial Technologies (OIT) BestPractices Technical Case Study'. Together they form a unique fingerprint.

    Cite this