Abstract
This study was prepared by Argonne National Laboratory, the National Laboratory of the Rockies and the U.S. Department of Energy's (DOE) Western Area Power Administration (WAPA) in support of a study that investigates potential changes in Glen Canyon Dam Hydropower Plant operations under a range of both future hydrology conditions and energy resource expansion scenarios in the Western Interconnection.
| Original language | American English |
|---|---|
| Number of pages | 91 |
| DOIs | |
| State | Published - 2026 |
NLR Publication Number
- NLR/TP-6A40-97048
Other Report Number
- ANL-25/67
Keywords
- drought
- Glen Canyon Dam
- hydro
- hydropower
- PLEXOS
- production cost modeling
Fingerprint
Dive into the research topics of 'Loss of Glen Canyon Dam Hydropower Plant Capabilities: U.S. Department of Energy, Hydropower and Hydrokinetic Office'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver