Abstract
The purpose of this analysis is to estimate how much electricity the redeveloped Ford Motor Company assembly plant site in St. Paul, Minnesota, might consume under different development scenarios and how much rooftop photovoltaic (PV) generation might be possible.
| Original language | American English |
|---|---|
| Number of pages | 25 |
| DOIs | |
| State | Published - 2015 |
NLR Publication Number
- NREL/TP-7A40-63418
Keywords
- electricity
- EPA
- estimate
- Ford
- Minnesota
- photovoltaic
- PV
- RE-Powering America's Land Initiative
- renewable
- rooftop
- solar
- St. Paul
Fingerprint
Dive into the research topics of 'Integration of Rooftop Photovoltaic Systems in St. Paul Ford Site's Redevelopment Plans'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver