Abstract
In electric utility planning measures of the risk of failure to meet load are extremely important. These measures are used in determining the value of a new source to a system mix and in expansion planning for the system.
| Original language | American English |
|---|---|
| Number of pages | 8 |
| DOIs | |
| State | Published - 1979 |
NLR Publication Number
- NREL/TP-35-375
Fingerprint
Dive into the research topics of 'Integration of Intermittent Sources Into Baleriaux -- Booth Production Cost Models'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver