Skip to main navigation Skip to search Skip to main content

Grid-Constrained Electric Vehicle Fast Charging Sites: Battery-Buffered Options

Research output: NLRFact Sheet

Abstract

This case study summarizes recent Joint Office of Energy and Transportation technical assistance work performed by the National Renewable Energy Laboratory which involved helping a state department of transportation analyze the feasibility of a battery energy storage system solution at a grid-constrained EV charging location.
Original languageAmerican English
PublisherNational Laboratory of the Rockies (NLR)
Number of pages13
StatePublished - 2024

NLR Publication Number

  • NREL/FS-5400-89492

Other Report Number

  • DOE/GO-102024-6238

Keywords

  • battery buffered
  • charging
  • electric vehicle
  • fast charging

Fingerprint

Dive into the research topics of 'Grid-Constrained Electric Vehicle Fast Charging Sites: Battery-Buffered Options'. Together they form a unique fingerprint.

Cite this