This paper proposes a methodology to include the wind power forecasting ability, or 'forecastability,' of a site as a design criterion in wind resource assessment and wind power plant design stages. The Unrestricted Wind Farm Layout Optimization (UWFLO) methodology is adopted to maximize the capacity factor of a wind power plant. The 1-hour-ahead persistence wind power forecasting method is usedto characterize the forecastability of a potential wind power plant, thereby partially quantifying the integration cost. A trade-off between the maximum capacity factor and the forecastability is investigated.
| Original language | American English |
|---|---|
| Number of pages | 9 |
| State | Published - 2014 |
| Event | 8th International Conference on Foundations of Computer-Aided Process Design - Cle Elum, Washington Duration: 13 Jul 2014 → 17 Jul 2014 |
Conference
| Conference | 8th International Conference on Foundations of Computer-Aided Process Design |
|---|---|
| City | Cle Elum, Washington |
| Period | 13/07/14 → 17/07/14 |
NLR Publication Number
- NREL/CP-5D00-61398
Keywords
- grid integration
- layout optimization
- turbine selection
- wind forecasting
- wind plant design
- wind resource assessment