Abstract
Create a detailed manufacturing, assembly, load-out, transportation, upending, turbine integration, and offshore transportation plan for a hypothetical project in one of the California lease areas off the central coast. Develop a detailed schedule and cost estimation for each step of the process and compare with conventional floating platform designs.
| Original language | American English |
|---|---|
| Number of pages | 8 |
| DOIs | |
| State | Published - 2025 |
NLR Publication Number
- NREL/TP-5000-96830
Keywords
- assembly
- CRADA
- floating offshore wind energy
- floating platform assembly
- Offshore Renewables Balance-of-system and Installation Tool (ORBIT)
- semisubmersible
Fingerprint
Dive into the research topics of 'Floating Offshore Wind US Manufacturing and Commercialization: Cooperative Research and Development Final Report, CRADA Number CRD-23-23781'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver