Abstract
This paper describes the integrated energy optimization process for buildings and building clusters and demonstrates this process for new construction projects and building retrofits. An explanation is given of how mission critical building loads affect possible site and source energy use reduction in Army buildings.
| Original language | American English |
|---|---|
| Number of pages | 20 |
| State | Published - 2012 |
| Event | 2012 ASHRAE Winter Conference - Chicago, Illinois, United States Duration: 21 Jan 2012 → 25 Jan 2012 |
Conference
| Conference | 2012 ASHRAE Winter Conference |
|---|---|
| Country/Territory | United States |
| City | Chicago, Illinois |
| Period | 21/01/12 → 25/01/12 |
NLR Publication Number
- NREL/CP-5500-53810
Keywords
- daylighting
- HVAC efficiency
- insulation levels
- lighting
- plug loads
- source energy savings
- tactical equipment maintenance facility (TEMF)
Fingerprint
Dive into the research topics of 'Extremely Low-Energy Design for Army Buildings: Tactical Equipment Maintenance Facility; Preprint'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver