Skip to main navigation Skip to search Skip to main content

Evaluating the Impact of the 2017 Solar Eclipse on U.S. Western Interconnection Operations

  • Peak Reliability
  • United States Department of Energy
  • National Renewable Energy Laboratory

Research output: NLRTechnical Report

Abstract

With support from the U.S. Department of Energy (DOE) Solar Energy Technologies Office (SETO), the National Renewable Energy Laboratory (NREL) partnered with Peak Reliability to evaluate the impact of the August 21, 2017 total solar eclipse on the reliability and grid operations in the Western Electricity Coordinating Council (WECC) territory.
Original languageAmerican English
Number of pages48
DOIs
StatePublished - 2018

NLR Publication Number

  • NREL/TP-5D00-71147

Keywords

  • 2017 solar eclipse
  • eclipse
  • electric grid
  • impact
  • peak reliability
  • solar

Fingerprint

Dive into the research topics of 'Evaluating the Impact of the 2017 Solar Eclipse on U.S. Western Interconnection Operations'. Together they form a unique fingerprint.

Cite this