Abstract
Establishing interconnection to the grid is a recognized barrier to the deployment of distributed energy generation. This report compares interconnection processes for photovoltaic projects in California and Germany. This report summarizes the steps of the interconnection process for developers and utilities, the average length of time utilities take to process applications, and paperworkrequired of project developers. Based on a review of the available literature, this report finds that while the interconnection procedures and timelines are similar in California and Germany, differences in the legal and regulatory frameworks are substantial.
| Original language | American English |
|---|---|
| Number of pages | 66 |
| DOIs | |
| State | Published - 2011 |
NLR Publication Number
- NREL/TP-7A30-51814
Keywords
- California
- Germany
- interconnection
- photovoltaic
- PV
- solar
Fingerprint
Dive into the research topics of 'Comparing Germany's and California's Interconnection Processes for PV Systems (White Paper)'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver